Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : AL0001422 Federal Type : C
Water System Name : NORTHEAST ALABAMA WATER, SEWER, AND FPD State Type :
Principal County Served : DEKALB Primary Source : SW
Status : A Activity Date : 01-01-1979

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
50 RT MN 01-01-2015 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP110 MONSANTO TREATMENT PLANT 0100 TURBIDITY 31 6 01-01-2001 95PT
TP110 MONSANTO TREATMENT PLANT 0100 TURBIDITY 31 6 01-01-2001 MAXT
TP110 MONSANTO TREATMENT PLANT 0999 CHLORINE 31 24 06-30-1993 SERD
TP110 MONSANTO TREATMENT PLANT 0999 CHLORINE 31 24 06-30-1993 EPRD
Total Number of Schedules Displayed = 4

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS200 DISTRIBUTION SYSTEM DBP2 DBP GROUP STAGE 2 10 RT QT 07-01-2025 to 09-30-2025 -----
DS200 DISTRIBUTION SYSTEM PBCU LEAD COPPER 30 RT 3Y 06-01-2023 to 09-30-2025 06-01-2026 to 09-30-2028
IN010 TENNESSEE RIVER (MONSANTO) LT2 LT2 GROUP 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
IN011 WATERLOO SPRING LT2 LT2 GROUP 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
IN012 TENNESSEE RIVER (FT. PAYNE WATER INTAKE) LT2 LT2 GROUP 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
TP110 MONSANTO TREATMENT PLANT SIOC INORGANICS SCHEDULES 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
TP110 MONSANTO TREATMENT PLANT SSOC SOCS SCHEDULE 2 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
TP110 MONSANTO TREATMENT PLANT SVOC VOCS SCHEDULE 1 RT YR Monitoring Completed 04-01-2026 to 06-30-2026
TP111 WATERLOO SPRINGS TREATMENT PLANT SIOC INORGANICS SCHEDULES 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
TP111 WATERLOO SPRINGS TREATMENT PLANT SSOC SOCS SCHEDULE 2 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
TP111 WATERLOO SPRINGS TREATMENT PLANT SVOC VOCS SCHEDULE 1 RT 3Y Monitoring Completed 01-01-2026 to 12-31-2028
TP112 HIGH POINT TREATMENT PLANT SIOC INORGANICS SCHEDULES 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
TP112 HIGH POINT TREATMENT PLANT SSOC SOCS SCHEDULE 2 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
TP112 HIGH POINT TREATMENT PLANT SVOC VOCS SCHEDULE 1 RT YR 10-01-2025 to 12-31-2025 10-01-2026 to 12-31-2026
Total Number of Schedules Displayed = 14

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
IN010 TENNESSEE RIVER (MONSANTO) 1927 ALKALINITY, TOTAL 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
IN010 TENNESSEE RIVER (MONSANTO) 2920 CARBON, TOTAL 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
IN010 TENNESSEE RIVER (MONSANTO) 3014 E. COLI 1 RT MN No Monitoring in Current Period ----
IN011 WATERLOO SPRING 1927 ALKALINITY, TOTAL 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
IN011 WATERLOO SPRING 2920 CARBON, TOTAL 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
IN011 WATERLOO SPRING 3014 E. COLI 1 RT MN No Monitoring in Current Period ----
IN012 TENNESSEE RIVER (FT. PAYNE WATER INTAKE) 1927 ALKALINITY, TOTAL 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
IN012 TENNESSEE RIVER (FT. PAYNE WATER INTAKE) 2920 CARBON, TOTAL 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
IN012 TENNESSEE RIVER (FT. PAYNE WATER INTAKE) 3014 E. COLI 1 RT MN No Monitoring in Current Period ----
TP110 MONSANTO TREATMENT PLANT 2920 CARBON, TOTAL 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
TP110 MONSANTO TREATMENT PLANT 4000 GROSS ALPHA, EXCL. RADON & U 1 RT 6Y 01-01-2023 to 12-31-2028 01-01-2029 to 12-31-2034
TP110 MONSANTO TREATMENT PLANT 1040 NITRATE 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
TP110 MONSANTO TREATMENT PLANT 4030 RADIUM-228 1 RT 9Y Monitoring Completed 01-01-2026 to 12-31-2034
TP110 MONSANTO TREATMENT PLANT 1055 SULFATE 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
TP111 WATERLOO SPRINGS TREATMENT PLANT 2920 CARBON, TOTAL 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
TP111 WATERLOO SPRINGS TREATMENT PLANT 4000 GROSS ALPHA, EXCL. RADON & U 1 RT 9Y 01-01-2017 to 12-31-2017 01-01-2026 to 12-31-2026
TP111 WATERLOO SPRINGS TREATMENT PLANT 1040 NITRATE 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
TP111 WATERLOO SPRINGS TREATMENT PLANT 4030 RADIUM-228 1 RT 9Y 01-01-2017 to 12-31-2017 01-01-2026 to 12-31-2026
TP111 WATERLOO SPRINGS TREATMENT PLANT 1055 SULFATE 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
TP112 HIGH POINT TREATMENT PLANT 2920 CARBON, TOTAL 1 RT MN 07-01-2025 to 07-31-2025 08-01-2025 to 08-31-2025
TP112 HIGH POINT TREATMENT PLANT 4000 GROSS ALPHA, EXCL. RADON & U 1 RT 9Y 01-01-2021 to 12-31-2029 01-01-2030 to 12-31-2038
TP112 HIGH POINT TREATMENT PLANT 1040 NITRATE 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
TP112 HIGH POINT TREATMENT PLANT 4030 RADIUM-228 1 RT 9Y 01-01-2021 to 12-31-2029 01-01-2030 to 12-31-2038
TP112 HIGH POINT TREATMENT PLANT 1055 SULFATE 1 RT YR 01-01-2025 to 12-31-2025 01-01-2026 to 12-31-2026
Total Number of Schedules Displayed = 24

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
SUBMIT STAGE 2 DSE MONITORING PLAN 2015-10-01
SUBMIT STAGE 2 DSE REPORT 2018-04-01
SUBMIT LCN CERTIFICATE 2019-12-29 12-29-2019
SUBMIT LCN CERTIFICATE 2022-12-29 12-29-2022
COMPLETE INITIAL LSL INVENTORY 2024-10-16 10-16-2024
SUBMIT MONTHLY OPERATIONAL REPORT 2025-05-10 05-06-2025
SUBMIT MONTHLY OPERATIONAL REPORT 2025-06-10 06-04-2025
CCR SUBMITTAL TO ADEM 2025-07-01
SUBMIT MONTHLY OPERATIONAL REPORT 2025-07-10
SUBMIT MONTHLY OPERATIONAL REPORT 2025-08-10
SUBMIT MONTHLY OPERATIONAL REPORT 2025-09-10
SUBMIT MONTHLY OPERATIONAL REPORT 2025-10-10
SUBMIT MONTHLY OPERATIONAL REPORT 2025-11-10
SUBMIT MONTHLY OPERATIONAL REPORT 2025-12-10
SUBMIT STAGE 2 DSE REPORT 2027-01-01
OPERATIONAL PERMIT RENEWAL SUBMITTAL 2028-03-04
PROCESS PERMIT RENEWAL 2028-08-31
Total Number of Compliance Schedules Displayed = 17

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Tue Jul 01 21:09:40 CDT 2025