Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : AL0001142 Federal Type : C
Water System Name : PHENIX CITY UTILITIES State Type :
Principal County Served : RUSSELL Primary Source : SW
Status : A Activity Date : 01-01-1960

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
50 RT MN 03-01-2020 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP101 PHENIX CITY WTP 0100 TURBIDITY 31 6 01-01-2001 95PT
TP101 PHENIX CITY WTP 0100 TURBIDITY 31 6 01-01-2001 MAXT
TP101 PHENIX CITY WTP 0999 CHLORINE 31 24 06-30-1993 SERD
TP101 PHENIX CITY WTP 0999 CHLORINE 31 24 06-30-1993 EPRD
Total Number of Schedules Displayed = 4

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS200 DISTRIBUTION SYSTEM DBP2 DBP GROUP STAGE 2 9 RT QT 07-01-2026 to 09-30-2026 10-01-2026 to 12-31-2026
DS200 DISTRIBUTION SYSTEM PBCU LEAD COPPER 30 RT 3Y 06-01-2026 to 09-30-2028 06-01-2029 to 09-30-2031
IN001 CHATTAHOOCHEE RIVER LT2 LT2 GROUP 1 RT MN No Monitoring in Current Period No Monitoring After 03-31-2026
TP101 PHENIX CITY WTP SIOC INORGANICS SCHEDULES 1 RT YR Monitoring Partially Completed 01-01-2027 to 12-31-2027
TP101 PHENIX CITY WTP PFAS PFAS 1 RT 6M 07-01-2026 to 12-31-2026 01-01-2027 to 06-30-2027
TP101 PHENIX CITY WTP SSOC SOCS SCHEDULE 2 RT 3Y Monitoring Completed 01-01-2029 to 12-31-2031
TP101 PHENIX CITY WTP SVOC VOCS SCHEDULE 1 RT YR 10-01-2026 to 12-31-2026 10-01-2027 to 12-31-2027
Total Number of Schedules Displayed = 7

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
IN001 CHATTAHOOCHEE RIVER 1927 ALKALINITY, TOTAL 1 RT MN 08-01-2026 to 08-31-2026 09-01-2026 to 09-30-2026
IN001 CHATTAHOOCHEE RIVER 2920 CARBON, TOTAL 1 RT MN 08-01-2026 to 08-31-2026 09-01-2026 to 09-30-2026
IN001 CHATTAHOOCHEE RIVER 3014 E. COLI 1 RT MN 08-01-2026 to 08-31-2026 09-01-2026 to 09-30-2026
TP101 PHENIX CITY WTP 2105 2,4-D 1 RT YR Monitoring Completed 07-01-2027 to 09-30-2027
TP101 PHENIX CITY WTP 2920 CARBON, TOTAL 1 RT MN 08-01-2026 to 08-31-2026 09-01-2026 to 09-30-2026
TP101 PHENIX CITY WTP 2031 DALAPON 1 RT YR Monitoring Completed 07-01-2027 to 09-30-2027
TP101 PHENIX CITY WTP 4000 GROSS ALPHA, EXCL. RADON & U 1 RT 9Y 01-01-2024 to 12-31-2032 01-01-2033 to 12-31-2041
TP101 PHENIX CITY WTP 1040 NITRATE 1 RT YR Monitoring Completed 01-01-2027 to 12-31-2027
TP101 PHENIX CITY WTP 4030 RADIUM-228 1 RT 9Y 01-01-2024 to 12-31-2032 01-01-2033 to 12-31-2041
TP101 PHENIX CITY WTP 2037 SIMAZINE 1 RT QT 07-01-2026 to 09-30-2026 10-01-2026 to 12-31-2026
TP101 PHENIX CITY WTP 1055 SULFATE 1 RT YR Monitoring Completed 01-01-2027 to 12-31-2027
Total Number of Schedules Displayed = 11

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
TIC - TANK INSPECTION COMPLETED 2006-05-19
TIC - TANK INSPECTION COMPLETED 2007-05-19
FACR - FACILITY REPAIRED 2008-01-19
TIC - TANK INSPECTION COMPLETED 2008-05-19
SUBMIT STAGE 2 DSE MONITORING PLAN 2015-10-01
SUBMIT MONTHLY OPERATIONAL REPORT 2017-12-10
SUBMIT STAGE 2 DSE REPORT 2018-04-01
SUBMIT LCN CERTIFICATE 2019-12-29 12-29-2019
CCR SUBMITTAL TO ADEM 2026-07-01 06-30-2026
SUBMIT MONTHLY OPERATIONAL REPORT 2026-07-10 07-07-2026
SUBMIT MONTHLY OPERATIONAL REPORT 2026-08-10 08-07-2026
SUBMIT MONTHLY OPERATIONAL REPORT 2026-09-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-10-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-11-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-12-10
OPERATIONAL PERMIT RENEWAL SUBMITTAL 2027-03-04
SUBMIT STAGE 2 DSE MONITORING PLAN 2027-04-01
PROCESS PERMIT RENEWAL 2027-08-31
Total Number of Compliance Schedules Displayed = 18

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Sun Aug 23 18:56:21 CDT 2026