Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : AL0000820 Federal Type : C
Water System Name : SMITHS WATER & SEWER AUTHORITY State Type :
Principal County Served : LEE Primary Source : SW
Status : A Activity Date : 06-01-1975

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
30 RT MN 05-01-2006 06-30-2026 1/1 12/31 3100 COLIFORM (TCR)
40 RT MN 07-01-2026 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 2

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP101 SMITHS WATER TREATMENT PLANT 0100 TURBIDITY 31 6 01-01-2001 95PT
TP101 SMITHS WATER TREATMENT PLANT 0100 TURBIDITY 31 6 01-01-2001 MAXT
TP101 SMITHS WATER TREATMENT PLANT 0999 CHLORINE 31 24 06-30-1993 EPRD
TP101 SMITHS WATER TREATMENT PLANT 0999 CHLORINE 31 24 06-30-1993 SERD
Total Number of Schedules Displayed = 4

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS200 DISTRIBUTION SYSTEM DBP2 DBP GROUP STAGE 2 5 RT QT 04-01-2026 to 06-30-2026 07-01-2026 to 09-30-2026
DS200 DISTRIBUTION SYSTEM DBP2 DBP GROUP STAGE 2 5 RT QT No Monitoring in Current Period No Monitoring After 03-31-2026
DS200 DISTRIBUTION SYSTEM PBCU LEAD COPPER 30 RT 3Y 06-01-2026 to 09-30-2028 06-01-2029 to 09-30-2031
IN001 LAKE OLIVER LT2 LT2 GROUP 1 RT MN No Monitoring in Current Period No Monitoring After 03-31-2026
TP101 SMITHS WATER TREATMENT PLANT SIOC INORGANICS SCHEDULES 1 RT YR 01-01-2026 to 12-31-2026 01-01-2027 to 12-31-2027
TP101 SMITHS WATER TREATMENT PLANT PFAS PFAS 1 RT QT 04-01-2026 to 06-30-2026 07-01-2026 to 09-30-2026
TP101 SMITHS WATER TREATMENT PLANT SSOC SOCS SCHEDULE 2 RT 3Y 01-01-2026 to 12-31-2028 01-01-2029 to 12-31-2031
TP101 SMITHS WATER TREATMENT PLANT SVOC VOCS SCHEDULE 1 RT 3Y Monitoring Completed 01-01-2029 to 12-31-2031
Total Number of Schedules Displayed = 8

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS200 DISTRIBUTION SYSTEM 1009 CHLORITE 3 RT MN 06-01-2026 to 06-30-2026 07-01-2026 to 07-31-2026
IN001 LAKE OLIVER 1927 ALKALINITY, TOTAL 1 RT MN 06-01-2026 to 06-30-2026 07-01-2026 to 07-31-2026
IN001 LAKE OLIVER 2920 CARBON, TOTAL 1 RT MN 06-01-2026 to 06-30-2026 07-01-2026 to 07-31-2026
IN001 LAKE OLIVER 3014 E. COLI 1 RT MN 06-01-2026 to 06-30-2026 07-01-2026 to 07-31-2026
TP101 SMITHS WATER TREATMENT PLANT 2920 CARBON, TOTAL 1 RT MN 06-01-2026 to 06-30-2026 07-01-2026 to 07-31-2026
TP101 SMITHS WATER TREATMENT PLANT 4000 GROSS ALPHA, EXCL. RADON & U 1 RT 9Y 01-01-2022 to 12-31-2030 01-01-2031 to 12-31-2039
TP101 SMITHS WATER TREATMENT PLANT 1040 NITRATE 1 RT YR 01-01-2026 to 12-31-2026 01-01-2027 to 12-31-2027
TP101 SMITHS WATER TREATMENT PLANT 4030 RADIUM-228 1 RT 9Y 01-01-2022 to 12-31-2030 01-01-2031 to 12-31-2039
TP101 SMITHS WATER TREATMENT PLANT 1055 SULFATE 1 RT YR 01-01-2026 to 12-31-2026 01-01-2027 to 12-31-2027
Total Number of Schedules Displayed = 9

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
COMPLETE INITIAL LSL INVENTORY 2024-10-16 10-16-2024
CCR SUBMITTAL TO ADEM 2025-07-01
SUBMIT MONTHLY OPERATIONAL REPORT 2026-04-10 04-08-2026
SUBMIT MONTHLY OPERATIONAL REPORT 2026-05-10 05-08-2026
SUBMIT MONTHLY OPERATIONAL REPORT 2026-06-10
CCR SUBMITTAL TO ADEM 2026-07-01
SUBMIT MONTHLY OPERATIONAL REPORT 2026-07-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-08-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-09-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-10-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-11-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-12-10
SUBMIT STAGE 2 DSE REPORT 2027-01-01
OPERATIONAL PERMIT RENEWAL SUBMITTAL 2029-01-01
PROCESS PERMIT RENEWAL 2029-06-30
Total Number of Compliance Schedules Displayed = 15

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Sun Jun 07 18:57:20 CDT 2026