Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : AL0000456 Federal Type : NTNC
Water System Name : INTERNATIONAL PAPER State Type : NTNC
Principal County Served : DALLAS Primary Source : GW
Status : A Activity Date : 04-01-1974

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
2 RT MN 08-01-2013 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS200 DISTRIBUTION SYSTEM DBP2 DBP GROUP STAGE 2 1 RT YR 09-01-2026 to 09-30-2026 09-01-2027 to 09-30-2027
DS200 DISTRIBUTION SYSTEM PBCU LEAD COPPER 10 RT 3Y 06-01-2026 to 09-30-2028 06-01-2029 to 09-30-2031
TP102 WELL NO. 2 PLANT SIOC INORGANICS SCHEDULES 1 RT 3Y 01-01-2026 to 12-31-2028 01-01-2029 to 12-31-2031
TP102 WELL NO. 2 PLANT SSOC SOCS SCHEDULE 1 RT 3Y 01-01-2026 to 12-31-2028 01-01-2029 to 12-31-2031
TP102 WELL NO. 2 PLANT SVOC VOCS SCHEDULE 1 RT 3Y 01-01-2026 to 12-31-2028 01-01-2029 to 12-31-2031
Total Number of Schedules Displayed = 5

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
TP102 WELL NO. 2 PLANT 1040 NITRATE 1 RT YR 01-01-2026 to 12-31-2026 01-01-2027 to 12-31-2027
TP102 WELL NO. 2 PLANT 1055 SULFATE 1 RT 3Y 01-01-2026 to 12-31-2028 01-01-2029 to 12-31-2031
WL002 WELL NO. 2 3014 E. COLI 1 RT QT Monitoring Completed 10-01-2026 to 12-31-2026
Total Number of Schedules Displayed = 3

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
CCR SUBMITTAL TO ADEM 2017-07-01
SUBMIT MONTHLY OPERATIONAL REPORT 2026-07-10 07-08-2026
PROCESS PERMIT RENEWAL 2026-07-31 07-22-2026
SUBMIT MONTHLY OPERATIONAL REPORT 2026-08-10 08-07-2026
SUBMIT MONTHLY OPERATIONAL REPORT 2026-09-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-10-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-11-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-12-10
FACR - FACILITY REPAIRED 03-06-2023
Total Number of Compliance Schedules Displayed = 9

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Wed Aug 26 07:11:32 CDT 2026