Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : AL0001782 Federal Type : C
Water System Name : BESSEMER,GUSC OF THE CITY OF State Type :
Principal County Served : JEFFERSON Primary Source : SW
Status : A Activity Date : 08-01-2000

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
2 RT MN 01-01-1991 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
DS200 DISTRIBUTION SYSTEM 1008 CHLORINE DIOXIDE 30 1 06-01-2010
DS200 DISTRIBUTION SYSTEM 1009 CHLORITE 1 3 06-01-2010
TP101 BESSEMER WATER TREATMENT PLANT 0100 TURBIDITY 31 2 01-01-2001 MAXT
TP101 BESSEMER WATER TREATMENT PLANT 0100 TURBIDITY 31 2 01-01-2001 95PT
TP101 BESSEMER WATER TREATMENT PLANT 0999 CHLORINE 31 1 06-30-1993 EPRD
TP101 BESSEMER WATER TREATMENT PLANT 0999 CHLORINE 31 1 06-30-1993 SERD
Total Number of Schedules Displayed = 6

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS200 DISTRIBUTION SYSTEM DBP2 DBP GROUP STAGE 2 2 RT QT 07-01-2026 to 09-30-2026 10-01-2026 to 12-31-2026
DS200 DISTRIBUTION SYSTEM PBCU LEAD COPPER 5 RT 3Y 06-01-2025 to 09-30-2027 06-01-2028 to 09-30-2030
IN001 BLACK WARRIOR RIVER (MULBERRY FORK) LT2 LT2 GROUP 1 RT MN 08-01-2026 to 08-31-2026 09-01-2026 to 09-30-2026
TP101 BESSEMER WATER TREATMENT PLANT SIOC INORGANICS SCHEDULES 1 RT YR Monitoring Partially Completed 01-01-2027 to 12-31-2027
TP101 BESSEMER WATER TREATMENT PLANT SSOC SOCS SCHEDULE 2 RT 3Y Monitoring Completed 01-01-2029 to 12-31-2031
TP101 BESSEMER WATER TREATMENT PLANT SVOC VOCS SCHEDULE 1 RT 3Y Monitoring Completed 01-01-2029 to 12-31-2031
Total Number of Schedules Displayed = 6

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS200 DISTRIBUTION SYSTEM 1009 CHLORITE 3 RT QT Monitoring Completed 10-01-2026 to 12-31-2026
IN001 BLACK WARRIOR RIVER (MULBERRY FORK) 1927 ALKALINITY, TOTAL 1 RT MN Monitoring Completed 09-01-2026 to 09-30-2026
IN001 BLACK WARRIOR RIVER (MULBERRY FORK) 2920 CARBON, TOTAL 1 RT MN Monitoring Completed 09-01-2026 to 09-30-2026
IN001 BLACK WARRIOR RIVER (MULBERRY FORK) 3014 E. COLI 1 RT MN No Monitoring in Current Period ----
TP101 BESSEMER WATER TREATMENT PLANT 2920 CARBON, TOTAL 1 RT MN Monitoring Completed 09-01-2026 to 09-30-2026
TP101 BESSEMER WATER TREATMENT PLANT 4000 GROSS ALPHA, EXCL. RADON & U 1 RT 9Y 01-01-2026 to 12-31-2026 01-01-2035 to 12-31-2035
TP101 BESSEMER WATER TREATMENT PLANT 1040 NITRATE 1 RT YR Monitoring Completed 01-01-2027 to 12-31-2027
TP101 BESSEMER WATER TREATMENT PLANT 4030 RADIUM-228 1 RT 9Y 01-01-2026 to 12-31-2026 01-01-2035 to 12-31-2035
TP101 BESSEMER WATER TREATMENT PLANT 1055 SULFATE 1 RT YR Monitoring Completed 01-01-2027 to 12-31-2027
Total Number of Schedules Displayed = 9

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
CCR SUBMITTAL TO ADEM 2026-07-01 01-14-2026
SUBMIT MONTHLY OPERATIONAL REPORT 2026-07-10 07-06-2026
SUBMIT MONTHLY OPERATIONAL REPORT 2026-08-10 08-03-2026
SUBMIT MONTHLY OPERATIONAL REPORT 2026-09-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-10-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-11-10
SUBMIT MONTHLY OPERATIONAL REPORT 2026-12-10
OPERATIONAL PERMIT RENEWAL SUBMITTAL 2029-07-04
PROCESS PERMIT RENEWAL 2029-12-31
SUBMIT 40/30 WAIVER OR VSS WAIVER 2034-04-01
Total Number of Compliance Schedules Displayed = 10

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Sun Aug 23 21:11:58 CDT 2026